Muse-inks: Hanging in there

Another week has passed without a single word being written on my WIP. There. I wrote it down. It must be true.

Things at work continue to be stressful. The latest, poor feedback on the training I did a couple of weeks ago has resulted in an additional workshop, hastily pulled together, which only five of the eleven participants are taking part in. If it was that much of an issue, I’m sure all of them would have signed on.

Admittedly, two of them did withdraw from the mentoring phase of training and returned to their normal duties and one returned to his specialized unit where he had already been doing most of what we were delivering the training on, but still. Eight people should have signed on.

It’s the reactionary nature of my employer, though. So, I’ll do what I’ve been asked to do.

And then, I’m heading out of town for most of a week for an in-person team meeting, leaving Phil and my mom to deal with what I expect to be a very upset Torvi. This will be the first time I’ve been away overnight, or for more than a day.

I don’t think I’m going to be able to get much writing done over the next couple of weeks, either.

Things should ease off after that, though.

I signed up for Jennifer Louden’s Get back to Creating workshop, though, and while I didn’t participate, I did watch the videos and garnered some tips for when I’ll be ready to use them.

And I have been thinking about Playing with Fire in the last week. That’s something.

Phil’s work troubles aren’t quite at an end yet, either. Again, progress is being made, enough for Phil to feel comfortable taking a few days off, but it’s a slow process and new crises seem to pop up on a daily basis.

Unfortunately, Phil took Friday off to deal with a leak in the basement. It’s been warm (above zero degrees Celsius) and rainy in the last week or so. A fair amount of freezing rain as well. He’s waiting for the next deluge to see if his repairs will address the problem. If not, he may be obliged to rent a jackhammer and install some weeping tile inside the basement (below the concrete) to divert the water to the sump pump, which has, interestingly enough, remained dry the whole time.

This has, of course, meant, that while the basement is once more in disarray, it is forbidden to Torvi. Just a week after having opened it up to her, we’ve had to deny her access. It’s been a challenge. She doesn’t understand 😦

Torvi Tales (Tails?)

A couple of things have happened in the last week that have been amusing.

One night, after she’d settled down, Torvi was sleeping on her back, which she still often does, propped against my legs as I worked at my standing desk. Without warning, or my human ears detecting any noise, Torvi flips over with a thump and charges for the front of the house, barking like mad.

It was enough to get Phil up from downstairs.

I think she was dreaming.

With all the freezing rain, just getting Torvi out to do her business is a challenge. The first day, she was sliding down the driveway (her favourite place to do number one) while she peed. The look on her face was priceless.

She hasn’t attempted to pee in the driveway since, though. It’s meant an increase in accidents indoors. With a week of above-zero daytime temperatures and freezing overnight, I don’t anticipate remediation in the short term.

But, she’s our sweetie.

And here she is, challenging Mommy to play.

The current list of Torvi’s nicknames: Torv, the Torvster, Torvina, Torvi-adore (like toreador, and yes, I sometimes hum Tosca to her), turkey-Torvi (cause she can be), sweetie, sweet pea, love/my love/little love, lovey-bum, fuzzy butt, puppy love, wee one (we call all of our dogs that), and Phil has come up with an elaborate one … Torvi Consuela Josephine. Don’t ask me why. He can’t even explain where the impulse came from.

So that is the weekly update.

Until Tuesday, be well, be kind, and stay strong. The world needs your stories.

Muse-inks